Request a demo
HomeManufacturing
Industrial solutions

OT and IT watched side by side, so a stoppage never starts as a breach.

On a production network, downtime and compromise cost the same thing. NetworkFort watches the plant floor and the corporate estate under one model, with collection that cannot interfere with either.

4Lines instrumented
0Stoppages caused
38sCell-level detect
Two networks, one model

The crossing is where trouble goes.

Attacks that reach production almost always arrive through the corporate side. That path is the thing to watch hardest.

Cell-level baselining

Each production cell profiled on its own traffic rhythm, including shift patterns.

Protocol awareness

Industrial protocols read at protocol level, without probing controllers.

Crossing surveillance

The IT-OT boundary carries the tightest thresholds in the deployment.

Shift rhythm

A second shift that behaves differently from the first is normal, and is learned as such.

Non-interference

Nothing sits in the production path.

Passive collection is not a preference here, it is a requirement, and containment is scoped so that it can never stop a line by accident.

  • Mirror-only collectionNo inline device, no failure mode that can halt production.
  • Scoped containmentIsolation authority is granted per segment, and production cells can be excluded entirely.
  • Maintenance windowsPlanned work is declared in advance, so scheduled changes never page anyone.
Stoppages caused0
Cell coverage100%
Cell-level detect time38s
Crossing events reviewed100%
Rollout

One line first.

Proving it on a single line is faster and safer than an estate-wide programme.

Instrument one line

Collection at the cell aggregation layer and the corporate crossing.

Learn the shifts

Two weeks of production rhythm, including changeovers and planned downtime.

Agree authority

Which segments may be isolated automatically, and which never may.

Extend

Repeat per line, reusing the tuning from the first.

Proof

What the baseline returns.

Figures from live engagements in this sector.

0Lines instrumented
0Stoppages caused
0Seconds to detect
0%Crossing coverage
From the floor

Said by someone who runs it.

A representative account of a NetworkFort engagement in this sector.

The thing that sold it internally was that nothing goes inline. Our plant managers had veto and there was nothing for them to veto.

P
Plant IT ManagerAutomotive supplier
Questions

Sector-specific answers.

The objections that come up in every one of these conversations.

Can this stop a production line?
Only if you explicitly authorise isolation on a production segment, and most customers never do.
Do you support legacy controllers?
Yes, passive observation does not care how old a controller is, which is the advantage.
What about shift changes and changeovers?
They become part of the baseline once observed, so they stop generating noise.
How long until it is useful?
A single line is usually usefully baselined inside two weeks.
Line-level walkthrough

Start with one line.

We will baseline a single production line and show you what the crossing looks like in traffic.